Well, our house has come a long way on the interior. All of the HVAC system has been installed. The plumbing has been roughed-in and all the tubs installed. All of the electrical system has been run (outlets and light fixtures) and we have two fireplaces installed. Next week, the low voltage man will come and install the sound system, phone/internet/cable, and central vacuum system. The carpenter has started building all of the cabinetry for the house and sheetrocking will begin in a few weeks! Whew! What a month! Here are some random pics from the inside of the house.
This will one day be my kitchen!!
Upstairs living room with fireplace.
Master bath tub.
Downstairs living area, will also have fireplace.
No comments:
Post a Comment